Planning Documentation
An Bord Pleanála Board Section 51 Order
An Bord Pleanála Board CPO Order
An Bord Pleanála Inspectors Section 51 Report
An Bord Pleanála Inspectors CPO Report
An Bord Pleanála Newspaper Notice for Section 51 Approval
An Bord Pleanála Newspaper Notices for Section 51 Approval
NTA Newspaper Notice 25th July 2024
Newspaper Notice 6th July 2023
Volume 1 Non-Technical Summary
Volume 2 - Main Chapters
- Volume 2 Preface
- Volume 2 Table of Contents
- Volume 2 Glossary
- Chapter 1 Introduction
- Chapter 2 Need for the Proposed Scheme
- Chapter 3 Consideration of Reasonable Alternatives
- Chapter 4 Proposed Scheme Description
- Chapter 5 Construction
- Chapter 6 Traffic and Transport
- Chapter 7 Air Quality
- Chapter 8 Climate
- Chapter 9 Noise & Vibration
- Chapter 10 Population
- Chapter 11 Human Health
- Chapter 12 Biodiversity
- Chapter 13 Water
- Chapter 14 Land, Soils, Geology and Hydrogeology
- Chapter 15 Archaeological and Cultural Heritage
- Chapter 16 Architectural Heritage
- Chapter 17 Landscape (Townscape) and Visual
- Chapter 18 Waste and Resources
- Chapter 19 Material Assets
- Chapter 20 Risk of Major Accidents and Disasters
- Chapter 21 Cumulative Impacts and Environmental Interactions
- Chapter 22 Summary of Mitigation and Monitoring Measures
- Chapter 23 Summary of Significant Residual Effects
Volume 3 - Figures
Chapter 4 Proposed Scheme Description
- 01. Site Location Plan
- 02. Mainline Plan and Profile
- 03. General Arrangement
- 04. Typical Cross Sections
- 05. Landscaping General Arrangement
- 06. Pavement Treatment Plans
- 07. Fencing and Boundary Treatment
- 08. Traffic Signs and Road Markings
- 09. Street Lighting
- 10. Junction System Design
- 11. Proposed Surface Water Drainage Works
- 12. IW Foul Sewer Asset Alterations
- 13. ESB Asset Alterations
- 14. GNI Asset Alterations
- 15. IW Water Asset Alterations
- 16. Telecommunications Asset Alterations
- 17. Combined Existing Utility Records
- 18. Frank Flood Bridge General Arrangement
- 19. Structures General Arrangement
Chapter 5 Construction
Chapter 6 Traffic and Transport
Chapter 7 Air Quality
Chapter 9 Noise and Vibration
Chapter 10 Population
Chapter 11 Human Health
Chapter 12 Biodiversity
Chapter 13 Water
Chapter 14 Land, Soils, Geology and Hydrogeology
Chapter 15 Archaeology & Cultural Heritage
Chapter 16 Architectural Heritage
Chapter 17 Landscape & Visual
Chapter 18 Waste & Resources
Chapter 21 Cumulative Impacts
Volume 4 Appendices - part 1 of 4
Chapter 2 Need for the Proposed Scheme Appendix
Chapter 4 Proposed Scheme Description Appendix
Chapter 5 Construction Appendix
Volume 4 Appendices Part 2 of 4
Chapter 6 Traffic and Transport Appendices
Volume 4 Appendices Part 3 of 4
Chapter 7 Air Quality Appendix
Chapter 8 Climate Appendix
Chapter 9 Noise and Vibration Appendices
Chapter 10 Population Appendices
Chapter 12 Biodiversity Appendix
Chapter 13 Water Appendices
Chapter 14 Land, Soils, Geology and Hydrogeology Appendices
Chapter 15 Archeology and Cultural Heritage Appendices
Chapter 16 Architectural Heritage Appendix
Volume 4 Appendices: Part 4 of 4
Chapter 17 Landscape (Townscape) and Visual Appendix
Chapter 18 Waste and Resources Appendices
Chapter 20 Risk of Major Accidents and or Disasters Appendices
Chapter 21 Cumulative Impacts Appendices
Main Report
Figures
Appendices
Swords to City Centre ABP Case Number ABP-317121-23 Letter 1 June 2023
Location Maps
Preferred Route Option Report
Preferred Route Option Report Appendices
- Appendix A - Preferred Route Option Drawings
- Appendix B - Public Consultation Submission Reports - 1st Non-Statutory Public Consultation
- Appendix C - Public Consultation Submission Reports - 2nd and 3rd Non-Statutory Public Consultation
- Appendix D - MCA Table - Options at Santry Demesne
- Appendix E - MCA Table - Cycle Route Options in Santry Village
- Appendix F - MCA Table - Route Options in Santry Village
- Appendix G - MCA Table - Drumcondra Rd Lr and Dorset St Lr
- Appendix H - Swords CBC Feasibility and Options Assessment
- Appendix I - Emerging Preferred Route Public Consultation November 2018
- Appendix J - Draft Preferred Route Public Consultation March 2020
- Appendix K - Preferred Route Third Round of Public Consultation November 2020
Preliminary Design Report
Preliminary Design Report Appendices
- Appendix A - Designer's Risk Assessment
- Appendix B - Contents Sheet
- Appendix B1 - Site Location Map and Site Location Plan
- Appendix B2 - General Arrangement
- Appendix B3 - Mainline Plan and Profile
- Appendix B4 - Typical Cross-sections
- Appendix B5 - Landscaping
- Appendix B6 - Pavement Treatment Plans
- Appendix B7 - Fencing and Boundary Treatment
- Appendix B8 - Traffic Signs and Road Markings
- Appendix B9 - Street Lighting
- Appendix B10 - Junction System Design
- Appendix B11 - Proposed Surface Water Drainage Works
- Appendix B12 - IW Foul Sewer Asset Alterations
- Appendix B13 - ESB Asset Alterations
- Appendix B14 - GNI Asset Alterations
- Appendix B15 - IW Water Asset Alterations
- Appendix B16 - Telecommunications Asset Alterations
- Appendix B17 - Combined Existing Utilities Records
- Appendix B18 - Frank Flood Bridge General Arrangement
- Appendix B19 - Structures General Arrangement
- Appendix C - Relaxations and Deviations Schedule
- Appendix D - Arboricultural Impact Assessment Report
- Appendix E - Geotechnical Factual Report
- Appendix F - Not Used
- Appendix G - Parking Survey Report
- Appendix H - Bus Stop Review Analysis
- Appendix I - Accessibility Audit Report
- Appendix J - Structures Preliminary Design Reports
- Appendix K - Drainage Design Basis Document
- Appendix L - Junction Design Report
- Appendix M1 - Stage 1 Quality Audit Report
- Appendix M2 - Stage 1 Road Safety Audit
- Appendix N - Flood Risk Assessment
- Appendix O - Preliminary Design Guidance Booklet